Dam projects - References

(>> More references at the bottom of the text !! )

Telebelt conveys enormous masses of concrete at the third-largest embankment dam in the world

Construction of an embankment dam with Telebelt in China
At the Jinsha River – a tributary of the Yangtze – the Xiluodu hydro-electric plant is currently being built. Its main purpose is to generate electricity but it also fulfils other tasks: flood protection, deposition of sediment, improvement of shipping conditions, etc. It is expected to produce from 57 to 64 billion kilowatt hours of electrical energy each year, making this plant the third largest hydro-electric plant in the world.

A double-curved arch dam should dam up a storage lake of 12.67 billion m3. The absolute elevation of the dam crest is 610 m, the max­imum height of the dam is 278 m and the overall length is 700 m. The total excavated material for this project amounts to 39.81 million m3 of which 25.61 million m3 is above-ground excavation and 14.20 million m3 is from the construction of tunnels.
In total, 16.72 million m3 of concrete is required for this project and 6.60 million m3 of this is required just for the body of the wall. The concreting work commenced in 2008. It is expected that the first generator sets can be installed in June 2012. From June 2013, the first electrical energy should be generated and the entire project should be completed by 2015. US$ 7.36 billion has been invested in the Xiluodu hydro-electric plant.

The devices in the Xiluodu dam that are planned for flood water flow include seven overflow drainage openings at a size of 12.5 m x 13.5 m, below them eight outlets at a size of 6 m x 6.7 m and four exceptionally large overflow tunnels (with a diameter of up to
15 m) – two tunnels on the right embankment and two more on the left. The overflow capacity of the project amounts to up to
49,923 m3/s. The power that is generated by the overflows is almost 100 million kilowatts and is therefore the highest in the world. The four overflow tunnels are the largest of their kind in the world and have a discharge rate of 16,000 m3/s, which is about a third of the entire outlet capacity of the plant.


The water quantity and flow rate place high demands on the concrete

Construction of an embankment dam with Telebelt in China
These numbers are not just attributed to the size of the tunnel but also to the flow rate of the river, which is amongst the fastest in the world (up to 50 m/s). Since these four overflow tunnels were designed to cope with exceptionally large quantities of water at an extremely high flow rate, the concrete that is used here must be of outstanding quality. The difference between this concrete and a pumpable concrete mix lies mainly in the proportions of the individual concrete raw materials that are used. Pumpable concrete requires a relatively high flowability so that it can flow through the delivery line. This means that concrete raw materials such as cement and fly ash are required in large quantities. However, cement creates a lot of hydration heat when setting the concrete, meaning that the temperature and crack formation are difficult to control. The dissipation of the hydration heat may pose a problem, particularly with structures such as a dam.

Telebelt comes out ahead

Telebelt is placing concrete at the gate of a tunnel
Telebelt is a mobile belt conveyor that can continuously convey any kind of bulk materials and concrete and is unrestricted by the pumpability of the concrete. Telebelt is there­fore the perfect solution for pouring high-quality mass concrete as it not only means that fewer cracks are formed but it also reduces the costs for the concrete.

The first Telebelt TB 105 delivered by Putzmeister has been used in the Three Gorges Dam project since the year 2000. To date, the number of operating hours amounts to more than 20,000 hours and the device continues to work properly – clear proof of the robustness and reliability of the Telebelt. Due to this experience, the company responsible for the Three Gorges project ordered two more Telebelts of the new type TB 110G for the team from SinoHydro Bureau 7. Since the machines are very convenient to operate and the boom can be gently and smoothly telescoped, swung, lifted and lowered, the two TB 110G devices are very popular on the construction site. The machine has evoked a positive response among the workers from SinoHydro Bureau 7: Concrete pouring has become child‘s play. However, if we look at the quantity of concrete that the Telebelt must continuously pour for each concreting – more than 1,000 m3 of concrete – it becomes clear just how hard the work is for the workers on the construction site.


Telebelt is in great demand across the entire power plant construction site

Die Zuschläge im verwendeten Beton sind bis zu 60 mm groß! Keine Chance für eine Pumpe, aber ein „gefundenes Fressen“ für den Telebelt.
The Xiluodu hydro-electric plant is a huge construction site. Several projects are ongoing at the same time and these are co-ordinated centrally. The individual construction teams work closely together.
It is often the case that immediately after one concreting task has finished, the belt conveyor travels to the next site of use on the construction site. Thanks to its high levels of flexibility and mobility, the Telebelt is often used “on the front line”. The TB 110G from Putzmeister was therefore not only used on the construction sites of SinoHydro Bureau 7 (in other words, to construct the overflow tunnels, the foundations of the cable crane structure and for above-ground concreting, etc.), but it also consider-ably helped the construction sites of Hydro Bureau 6 and Hydro Bureau14 (among others) when constructing the surge tank, the underwater outlet, the main transformer building etc. As a result, on one occasion, the Telebelt was used on five different construction sites within six days, during which time it continuously placed 4,800 m3 of concrete for the overflow tunnel, the cable crane platform and the underwater outlet. The high level of efficiency demonstrated by the belt conveyor is another performance feature that is recognised on the construction site. For example, the TB 110G generally requires only 2.5 minutes to drain a mixer of 6 m3 for the work on the cable crane platform and, at a slightly higher speed, it requires only 1.8 minutes to drain the mixer. This extremely high machine output significantly contributes to completing the work within the scheduled time.
References with the topic of dam construction
Construction of power plant in Kanada (1140 kB)
Telebelt in Ethiopia (149 kB)
XinAnJiang Lack Side Multi Purpose Hydro Project, China