Link to SANY
Language: 
International
PartnerNet
Imprint
Privacy statement

Tunnel-Snorkel Distributor TSV 3-6

> Erstes Bild
Product Picture
Application
 

The TSV 3-6 tunnel snorkel distributor is a concrete placing and distributing system for large-scale formworks. The TSV unit rides on rails set into the tunnel formwork and can turn the telescopic snorkel pipe 360° rectangular to the formwork axle. The snorkel system is driven by an own power pack with 7,5 kW. The unit is linked to an scissor pipe system (125 mm diam.) which also rides on rails. The tunnel snorkel can supply a length of 8,5 m without putting in or off any concrete pipe. The driving langth can be increased by additional scissor pipes on request.

Info-Download

* Specifications subject to change without prior notice, no responsibility is taken for the correctness of this information.
 
 

Name:
Passwort:

Home Sitemap About this site Print
Enter your search here.

Feedback
 
Find us on Facebook Follow us on Twitter: @PMGruppe